24秋国开电大春福建广播电视大学管理英语3Unit 4 形考成绩单元自测4(10分)参考答案(1)_1

[复制链接]
查看: 39|回复: 0

19万

主题

19万

帖子

59万

积分

论坛元老

Rank: 8Rank: 8

积分
597069
发表于 2024-10-12 04:34:15 | 显示全部楼层 |阅读模式
Unit 4 形考成绩_单元自测4(10分)0
Unit 4 形考成绩_单元自测4(10分)0
试卷总分:100    得分:100
一、选择填空,从每选项中选出一个能填入空白处的最佳选项(每题10分)。
1. — Would you like some more beer?

— _________,please.
A. Just a little
B. No more
C. I've had enough
答案:

2.— I'm dog tired. I can't walk any further, Tommy.

— ______, Jenny. You can do it.
A. No problem
B. Come on
C. No hurry
答案:

3.Many factors both at home and abroad _____ the bankruptcy of the multinational corporation.
A. based on
B. put on
C. contributed to
答案:

4.Bring me a glass of beer, _____ ?
A. shall I,我们的目标是要做全覆盖、全正确的答案搜索服务。
B. don't you
C. will you
答案:

5.In Beijing, the best season in a year is probably__________autumn.
A. late
B. later
C. latter
答案:

6.二、阅读理解
一网一平台答案
阅读下面的文章,根据文章内容,完成相应的选择题。(每题10分)
Road Closure Procedures in Sydney
  To minimize traffic jams in the city center and on major roads out of Sydney, the City's highway department will not agree to road closures scheduled for weekdays or Saturdays. On minor roads outside the city center, weekdays and Saturdays may be considered. You must apply for approval to do roadwork and other road-related activities, tree cutting and use of very large construction machinery, ladders, etc. Please note that approval is needed if you plan to block the road or footpath.

  Applications to have a road closed to traffic must be completed and sent to the Department's Traffic Calming Committee at least a month before the scheduled date.

  Roads can be closed partially or fully, depending on your requirements. Partial road closures are only allowed in light traffic areas where there will be at least 1 lane for traffic with extra traffic control measures to make sure 2-way traffic can continue to run for the duration of the work. Any change of traffic flow will require the proposal to be treated as a full road closure. For further information about a partial road closure, please refer to Contacts.

  If you are organizing a parade, march or other type of street-based event, approval is also required and we recommend you choose one of our 4 preferred routes. Choosing an existing route reduces the amount of planning you will need to do.

 

操作提示:通过题干后的下拉框选择题目的正确答案。


1. As a rule, Sydney's highway department will agree to road closures in the city centre scheduled for __________. 

 A. weekdays

 B. Saturdays

 C. Sundays


2. If you want a road closed to traffic, you must complete your applications and send them to the relevant committee at least__________ before the scheduled date.

 A. a week

 B. 30 days
 C. two months


3. Partial of full road closures are decided by _________.

 A. the requirements from applicants

 B. the traffic flow

 C. the road conditions


4. Which is NOT the condition for partial road closures according to the passage?国开形成性考核答案

 A. In light traffic areas.

 B. On work days.
 C. There will be at least 1 lane for traffic during the work.

5. Which is the best title of this passage?

 A. Road Closure Procedures in Sydney

 B. Road Conditions in Sydney

 C. Road Management in Sydney
(1).
A. A
B. B
C. C
答案:
(2).
A. A
B. B,我们的目标是要做全覆盖、全正确的答案搜索服务。
C. C,我们的目标是要做全覆盖、全正确的答案搜索服务。
答案:
(3).
A. A,我们的目标是要做全覆盖、全正确的答案搜索服务。
B. B
C. C
答案:
(4).
A. A
B. B
C. C
答案:
(5).
A. A
B. B
C. C
答案:





上一篇:24秋国开电大春福建广播电视大学管理英语3Unit 4 形考成绩单元自测4(10分)参考答案_1
下一篇:24秋国开电大春福建广播电视大学管理英语3Unit 3 形考成绩单元自测3(10分)参考答案_1
回复

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

本版积分规则

精彩课程推荐
|网站地图|网站地图