|
单元自测4(形考占比10%)答卷
单元自测4(形考占比10%)
试卷总分:100 得分:100
一、选择填空,从每题选项中选出一个能填入空白处的最佳选项(每题10分)。
一网一平台答案
1. — It's getting dark. I'm afraid I must be off now.
— OK. _________
A. Take it easy.
B. Go slowly.
C. See you.
答案:
2.— I'm dog tired. I can't walk any further, Tommy.
— ______, Jenny. You can do it.
A. No problem国开形成性考核答案
B. Come on,我们的目标是要做全覆盖、全正确的答案搜索服务。
C. No hurry
答案:
3.I bought a new car last month, but I ______ my old car yet.
A. did not sell
B. have not sold
C. had not sold
答案:
4.Bring me a glass of beer, _____ ?
A. shall I
B. don't you
C. will you
答案:
5.— When do we have to pay the bill?
—____ December 30.
A. By
B. In
C. During
答案:
6.二、阅读理解
阅读下面的文章,根据文章内容判断文章后的句子是正确(T)还是错误(F)。(每题10分)
Road Closure Procedures in Sydney
To minimize traffic jams in the city center and on major roads out of Sydney, the City's highway department will not agree to road closures scheduled for weekdays or Saturdays. On minor roads outside the city center, weekdays and Saturdays may be considered. You must apply for approval to do roadwork and other road-related activities, tree cutting and use of very large construction machinery, ladders, etc. Please note that approval is needed if you plan to block the road or footpath.
Applications to have a road closed to traffic must be completed and sent to the Department's Traffic Calming Committee at least a month before the scheduled date.
Roads can be closed partially or fully, depending on your requirements. Partial road closures are only allowed in light traffic areas where there will be at least 1 lane for traffic with extra traffic control measures to make sure 2-way traffic can continue to run for the duration of the work. Any change of traffic flow will require the proposal to be treated as a full road closure. For further information about a partial road closure, please refer to Contacts.
If you are organizing a parade, march or other type of street-based event, approval is also required and we recommend you choose one of our 4 preferred routes. Choosing an existing route reduces the amount of planning you will need to do.
操作提示:句子正确选择下拉选项框为“T”;句子错误选择下拉选项框为“F”。
Closures scheduled for Sundays on minor roads outside the city center may be considered. 1
2. You need to get approval if you plan to block the road or footpath. 2
3. Roads can only be closed partially. 3
一网一平台答案
4. If you choose an existing route for a parade, the amount of planning will be reduced. 4
5. Road closure applications can be sent to the Department's Traffic Calming Committee one week before the scheduled date. 5
(1).__1__
A. T
B. F
答案:
(2).__2__,我们的目标是要做全覆盖、全正确的答案搜索服务。
A. T
B. F
答案:
(3).__3__
A. T
B. F
答案:一网一平台答案
(4).__4__,我们的目标是要做全覆盖、全正确的答案搜索服务。
A. T
B. F
答案:
(5).__5__
A. T
B. F
答案: |
上一篇:24秋国开电大春管理英语3单元自测3(形考占比10%)答卷参考答案下一篇:24秋国开电大春管理英语3单元自测1(形考占比10%)答卷参考答案
|