24秋国开电大春结束河北广播电视大学管理英语3Unit 4 形考成绩Unit 4 Self-test参考答案_1

[复制链接]
查看: 13|回复: 0

19万

主题

19万

帖子

59万

积分

论坛元老

Rank: 8Rank: 8

积分
597069
发表于 2024-10-11 21:45:56 | 显示全部楼层 |阅读模式
Unit 4 形考成绩_Unit 4 Self-test0
Unit 4 形考成绩_Unit 4 Self-test0
试卷总分:100    得分:100
一、选择填空,从每选项中选出一个能填入空白处的最佳选项(每题10分)。
1. — I've started my own software company.

—________________
A. No kidding! Congratulations!
B. If I had the money, I'd start one.
C. Could you tell me who is the owner?国开形成性考核答案
答案:

2.— Would you like some more beer?

— _________,please.
A. No more,我们的目标是要做全覆盖、全正确的答案搜索服务。
B. Just a little国开形成性考核答案
C. I've had enough
答案:

3.Raising pigs_____ my job at that time.
A. were
B. was
C. has been
答案:

4.Many factors both at home and abroad _____ the bankruptcy of the multinational corporation.
A. put on
B. contributed to
C. based on,我们的目标是要做全覆盖、全正确的答案搜索服务。
答案:

5.In Beijing, the best season in a year is probably__________autumn.
A. latter
B. later
C. late
答案:
6.二、阅读理解
阅读下面的文章,根据文章内容判断文章后的句子是正确(T)还是错误(F)。(每题10分)国开形成性考核答案
Road Closure Procedures in Sydney
  To minimize traffic jams in the city center and on major roads out of Sydney, the City's highway department will not agree to road closures scheduled for weekdays or Saturdays. On minor roads outside the city center, weekdays and Saturdays may be considered. You must apply for approval to do roadwork and other road-related activities, tree cutting and use of very large construction machinery, ladders, etc. Please note that approval is needed if you plan to block the road or footpath.

  Applications to have a road closed to traffic must be completed and sent to the Department's Traffic Calming Committee at least a month before the scheduled date.

  Roads can be closed partially or fully, depending on your requirements. Partial road closures are only allowed in light traffic areas where there will be at least 1 lane for traffic with extra traffic control measures to make sure 2-way traffic can continue to run for the duration of the work. Any change of traffic flow will require the proposal to be treated as a full road closure. For further information about a partial road closure, please refer to Contacts.

  If you are organizing a parade, march or other type of street-based event, approval is also required and we recommend you choose one of our 4 preferred routes. Choosing an existing route reduces the amount of planning you will need to do.

 

操作提示:句子正确选择下拉选项框为“T”;句子错误选择下拉选项框为“F”。

1. Closures scheduled for Sundays on minor roads outside the city center may be considered.,我们的目标是要做全覆盖、全正确的答案搜索服务。

2. You need to get approval if you plan to block the road or footpath.


3. Roads can only be closed partially.


4. If you choose an existing route for a parade, the amount of planning will be reduced.

5. Road closure applications can be sent to the Department's Traffic Calming Committee one week before the scheduled date.
(1).国开形成性考核答案
A. T
B. F
答案:
(2).
A. T
B. F
答案:
(3).
A. T
B. F
答案:
(4).
A. T
B. F
答案:,我们的目标是要做全覆盖、全正确的答案搜索服务。
(5).
A. T
B. F
答案:





上一篇:24秋国开电大春结束河北广播电视大学管理英语3Unit 5 形考成绩Unit 5 Self-test参考答案_1
下一篇:24秋国开电大春结束河北广播电视大学管理英语3Unit 1 形考成绩Unit 1 Self-test参考答案_1
回复

使用道具 举报

您需要登录后才可以回帖 登录 | 立即注册

本版积分规则

精彩课程推荐
|网站地图|网站地图